Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , Brunel University.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis, Unpublished PhD Thesis, , Brunel University.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials, Unpublished PhD Thesis, , Brunel University.

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities, Unpublished PhD Thesis, Business School, Brunel University.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects, Unpublished PhD Thesis, , Brunel University.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform, Unpublished PhD Thesis, Department of Politics, History and Law, Brunel University.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK, Unpublished PhD Thesis, , Brunel University.

Clark, G G (1993) Rule-based integrated building management systems, Unpublished PhD Thesis, , Brunel University.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Jashapara, A (1995) Learning in organizations: A study of the UK construction industry, Unpublished PhD Thesis, Henley Management College, Brunel University.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment, Unpublished PhD Thesis, , Brunel University.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD, Unpublished PhD Thesis, , Brunel University.

  • Type: Thesis
  • Keywords: CAD systems; communication; designer; case study
  • ISBN/ISSN:
  • URL: http://bura.brunel.ac.uk/handle/2438/5316
  • Abstract:
    This research investigates computer-based collaborative design environments, in particular issues of real-time collaborative 3D CAD. The thesis first presents a broad perspective of collaborative design environments with a preliminary case study of team design activities in a conventional and a computer mediated setting. This study identifies the impact and the feasibility of computer support for collaborative design and suggests four kinds of essential technologies for a successful collaborative design environment: information-sharing systems, synchronous and asynchronous co- working tools, project management systems, and communication systems. A new conceptual framework for a real-time collaborative 3D design tool, Shared Stage, is proposed based upon the preliminary study. The Shared Stage is defined as a shared 3D design workspace aiming to smoothly incorporate shared 3D workspaces into existing individual 3D workspaces. The addition of a Shared Stage allows collaborating designers to interact in real-time and to have a dynamic and interactive exchange of intermediate 3D design data. The acceptability of collaborative features is maximised by maintaining consistency of the user interface between 3D CAD systems. The framework is subsequently implemented as a software prototype using a new software development environment, customised by integrating related real-time and 3D graphic software development tools. Two main components of the Shared Stage module in the prototype, the Synchronised Stage View (SSV) and the Data Structure Diagram (DSD), provide essential collaborative features for real-time collaborative 3D CAD. These features include synchronised shared 3D representation, dynamic data exchange and awareness support in 3D workspaces. The software prototype is subsequently evaluated to examine the usefulness and usability. A range of quantitative and qualitative methods is used to evaluate the impact of the Shared Stage. The results, including the analysis of collaborative interactions and user perception, illustrate that the Shared Stage is a feasible and valuable addition for real-time collaborative 3D CAD. This research identifies the issues to be addressed for collaborative design environments and also provides a new framework and development strategy of a novel real-time collaborative 3D CAD system. The framework is successfully demonstrated through prototype implementation and an analytical usability evaluation.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry, Unpublished PhD Thesis, , Brunel University.

Paling, D R (1982) Industrial relations in the building, civil engineering and engineering construction industries, Unpublished PhD Thesis, , Brunel University.

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry, Unpublished PhD Thesis, Department of Mechanical Engineering, Brunel University.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry, Unpublished PhD Thesis, , Brunel University.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application, Unpublished PhD Thesis, , Brunel University.